In CFR 21-820.30f - Design Verification and CFR 21-820.30g - Design Validation. Design verification activities include the following:

  • Verification training by the design team
  • Pretesting review that consists of a complete and thorough review of the following:
    • Design inputs or requirements
    • Design outputs or specifications
    • Assessments to ensure that the design output or specifications meet the design input or requirements
    • Risk analysis and control of identified individual hazards
    • All labelling against requirements, specifications and risk analysis including documentaion risk or hazards
  • Master Verification Plan including the following:
    • Verification criteria
    • Verification assumptions and expectations
    • Verification personnel, their qualifications and responsibilities
  • Appropriate testing of the following:
    • Individual parts elements, components, modules, software components
    • All inputs under normal, abnormal and absurd conditions
    • Testing deviations or failures
    • Deviations or failures after approprate corrective actions
  • Equipment calibrated with test equipment and controlled with appropriate requirements
  • Master verification and test plans should do the following:
    • Consider any Premarket notification documetation requirements
    • Perform according to written and approved master verification plan and test plans
    • Ensure identified risks or hazards are fully tested via written test plans
  • Documentation that verifies design review and appropriate testing
    • Identification of the device
    • Methods used in the verification
    • Dates
    • Individuals performing the verification
    • All verification documentation should be considered Controlled Documentation
  • Verification review in which appriopriate individuals review and approve all verifictaion activities, including master verification plan, test plans, test results and any retesting after corrective actions or changes.