Manufacturing Resource Planning (MRP2)

From knowledgebase
Jump to navigation Jump to search

Around the 1980s as a 'better' operations model than Material Requirements Planning (MRP), Manufacturing Resource Planning (MRP2) was defined. The difference is that capacity planning was added.