Manufacturing Resource Planning (MRP2)
Jump to navigation
Jump to search
Around the 1980s as a 'better' operations model than Material Requirements Planning (MRP), Manufacturing Resource Planning (MRP2) was defined. The difference is that capacity planning was added.