Project IRR

From knowledgebase
Revision as of 07:23, 25 August 2020 by Dirkjan (talk | contribs) (Created page with "The project IRRs consider the project cash flows before considering funding, with initial negatives equal to construction costs, and later positives from the net opera...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The project IRRs consider the project cash flows before considering funding, with initial negatives equal to construction costs, and later positives from the net operating cash flows, and gives a measure of the general strength of the project.


See also: IRR