Project IRR

From knowledgebase
Revision as of 19:25, 27 August 2020 by Dirkjan (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The project IRRs consider the project cash flows before considering funding, with initial negatives equal to construction costs, and later positives from the net operating cash flows, and gives a measure of the general strength of the project.


See also: IRR