Manufacturing Resource Planning (MRP2)
Revision as of 08:12, 25 August 2020 by Dirkjan (talk | contribs) (Created page with "Around the 1980s as a 'better' operations model than Material Requirements Planning (MRP), Manufacturing Resource Planning (MRP2) was...")
Around the 1980s as a 'better' operations model than Material Requirements Planning (MRP), Manufacturing Resource Planning (MRP2) was defined. The difference is that capacity planning was added.