The length of time required to recover the cost of an investment. Calculated as
Pay back period =
Using the following example:
| Project | \[C_0\] | \[C_1\] | \[C_2\] | \[C_3\] | Payback | NPV at 10% |
|---|---|---|---|---|---|---|
| A | ||||||
| 500 | 500 | 5000 | 3 | |||
| B | ||||||
| 500 | 1800 | 0 | 2 | |||
| C | ||||||
| 1800 | 500 | 0 | 2 |
- The payback rule ignores all cash flows after the cut off date.
- The payback rule gives equal weight to all cash flows before the cutoff date.